Factors affecting the performance of construction projects in the Gaza Strip

TLDR
In this article, a comprehensive literature review was deployed to generate a set of factors believed to affect project performance, and a total of 120 questionnaires were distributed to three key groups of project participants, namely owners, consultants and contractors.
Abstract
Construction projects located in the Gaza Strip, Palestine suffer from many problems and complex issues. Consequently, the objective of this paper is to identify the factors affecting the performance of local construction projects; and to elicit perceptions of their relative importance. A comprehensive literature review was deployed to generate a set of factors believed to affect project performance. A total of 120 questionnaires were distributed to 3 key groups of project participants; namely owners, consultants and contractors. The survey findings indicate that all 3 groups agree that the most important factors affecting project performance are: delays because of borders/roads closure leading to materials shortage; unavailability of resources; low level of project leadership skills; escalation of material prices; unavailability of highly experienced and qualified personnel; and poor quality of available equipment and raw materials. Based on these findings, the paper recommends that: 1) project ...

read more

Content maybe subject to copyright    Report

Citations
More filters
Journal ArticleDOI

Causes of delays in construction projects in Turkey

TL;DR: In this paper, the causes of time extensions in the Turkish construction industry and levels of their importance were examined together, and 34 factors affecting project duration were taken into account, and a questionnaire survey was then applied to 71 construction companies in Turkey and the outcomes were evaluated by means of statistical analyses.
Journal ArticleDOI

Determining Critical Success Factors of Project Management Practice: A Conceptual Framework☆

TL;DR: In this paper, a conceptual framework was developed by identifying five (5) variables for project success namely Project Management Action, Project Procedures, Human Factors, External Issues and Project Related Factors.
Journal ArticleDOI

A survey of the factors affecting the productivity of construction projects in Iran

TL;DR: In this article, the authors defined the factors and grounds affecting sub-contractors productivity and evaluated their overall negative side effects on project productivity via a structured questionnaire, a total of 31 factors selected and were divided into seven broad categories.
Journal ArticleDOI

Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects

TL;DR: In this article, the authors applied the Structural Equation Modeling (SEM) approach and built a model that explained and identified the critical factors affecting quality in social infrastructure projects.
Journal ArticleDOI

A Bayesian Belief Network model of organizational factors for improving safe work behaviors in Thai construction industry

TL;DR: In this article, a Bayesian network is used to explore the influence of organizational factors and their impact on safe work behavior through manipulating a combination of organizational and human factors, which can be used to identify the useful implications that might lead to the highest probability of safe work behaviour.
References
More filters
Journal ArticleDOI

Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study

TL;DR: In this article, the authors present the results of a questionnaire survey conducted to identify and evaluate the relative importance of the significant factors contributing to delay and cost overruns in Ghana groundwater construction projects.
Journal ArticleDOI

Significant factors causing delay in the UAE construction industry

TL;DR: In this paper, a detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry to identify the most significant causes of delay in order to avoid or minimize their impact on construction projects.
Journal ArticleDOI

Factors affecting cost performance: evidence from Indian construction projects

TL;DR: In this article, the authors presented the findings of a questionnaire survey conducted on the factors affecting cost performance of Indian construction projects and extracted seven factors Critical success factors obtained by the analyses are: project manager competence; top management support; project manager's coordinating and leadership skill; monitoring and feedback by the participants; coordination among project participants; and owners competence and favourable climatic condition.
Journal ArticleDOI

Key performance indicators and assessment methods for infrastructure sustainability—a South African construction industry perspective

TL;DR: In this paper, an analytical decision model and a structured methodology for sustainability appraisal in infrastructure projects in a developing country like South Africa is proposed, where the authors identify key performance indicators (KPI) for infrastructure delivery and maps computational methods required to achieve sustainability objectives in developing countries.
Journal ArticleDOI

Large construction projects in developing countries: a case study from Vietnam

TL;DR: In this article, the authors present problems of large construction projects in Vietnam and identify five major factors: incompetent designers/contractors, poor estimation and change management, social and technological issues, site related issues, and improper techniques and tools.
Related Papers (5)